Project Overview:

  • Client: UEL

  • Type of Works: Groundworks, Concrete Topping and External Works.

  • Value: £3.1m

  • Project Start Date: January 2005

  • Location: London

O’Keefe carried out both the enabling works, groundworks, insitu RC & external works packages on this phase of UEL development. The enabling works comprised a bulk excavation and a stabilised platform, forming part of the permanent works and pile mat.

The ground work formed a complex matrix of ground beams, wrapped in several layers of insulation and waterproofing, which is ideally suited for use in a stabilised platform. Particular attention had to be paid to environmental issues as we were working dock-side of the Royal Dock and almost under the flight path of planes out of City Airport.